Installation and connections
Working on fans, dampers, ducts and control connections within the agreed scope.
4OUR / 08
We install, check and maintain smoke extraction and pressurisation systems. We focus on fans, dampers, control equipment and their coordinated operation according to the design.
4OUR · Smoke extraction and pressurisationSmoke extraction and pressurisation are parts of smoke control ventilation with different functions. Work requires information about zones, equipment, control sequences and the system’s current condition.
Working on fans, dampers, ducts and control connections within the agreed scope.
Checking the design-specified start-up sequence and commands between system components.
Inspecting accessible equipment and checking condition and operation against the agreed work list.
Finding faults, restoring assemblies and retesting completed work.
This service concerns smoke removal from the zones specified in the design. We check the agreed equipment set: fans, dampers, controls and signals. The scope of installation, maintenance or restoration is determined after reviewing the system. Where instrumental measurements are needed, their scope and conditions are included separately in the work programme.
The system supplies air to protected zones in accordance with the design. We consider fans, air paths, dampers and controls together. Operating-mode checks, measurements and interaction with other systems are agreed for the specific site.
Tell us about the building, equipment and task. We clarify the available information and whether a site inspection is needed.
We agree the work, materials, documents, timing and price before starting.
We carry out the agreed work, check the result and hand over the documents and recommendations specified in the contract.
Pricing depends on zone, fan and damper counts, access, control-system condition and the scope of checks. The design, equipment list and current observations help us prepare an estimate.
Yes. We can agree a combined smoke control work list while recording the checks for each system separately.
Yes, within the design-specified interfaces. We clarify the sequence and coordinate actions with building operations before testing.
We clarify the installed system’s purpose and the specific task. General ventilation and smoke control modes are considered according to the design, with a separate list of necessary work.
4OUR / Contact
Tell us where the site is, how it is used and what you need. If you have floor plans or an equipment list, attach them to your enquiry.
← All services on the homepage